Contractor’s Guide to Fast Pipe Delivery: Optimizing Lead Time, Coatings, and Logistics
- Pipekom
- Aug 5
- 2 min read
In pipeline procurement, lead time is as critical as quality. Delays in pipe delivery can disrupt schedules, inflate project costs, and jeopardize contractual obligations. Whether in water infrastructure, oil & gas transmission, or industrial projects, fast pipe delivery is a decisive factor in contractor success.
At Pipekom, we’ve engineered our operations to meet these time-sensitive demands with speed, traceability, and technical precision.
🔍 Understanding the Technical Timeline of Pipe Delivery
To ensure fast and predictable delivery, contractors must account for several key variables:
1. Pipe Type and Availability
Standard sizes (e.g., 4"–24" ERW, SSAW, or seamless pipe in S355JR or API 5L Gr.B/X42):
✅ Delivery from stock: 3–7 days (FOB)
✅ From rolling mills: 3–4 weeks production lead time
Non-standard dimensions or high-grade materials (e.g., X60+, A333 Gr.6, ASTM A106 Gr.C):
⏳ Lead time: 5–8 weeks depending on mill backlog and testing
2. Internal and External Coatings
Coating can be a critical path item, especially for pipelines exposed to aggressive environments.
External Coatings:
3LPE: +5–8 working days
FBE: +4–6 working days
Bitumen or Coal Tar Epoxy: +3–5 days
Internal Linings:
Cement Mortar Lining (CML): +4–6 working days
Fusion Bonded Epoxy (FBE): +5–7 days
Polyurethane Lining: +5–8 working days depending on diameter and thickness
All coatings follow ISO 21809, AWWA C210/C213, or EN 10289, with full QC documentation upon dispatch.
3. Testing & Certifications
Depending on specification, testing requirements may include:
Hydrotesting (100% per EN 10224, API 5L)
NDT: UT, RT, MPI
Third-party inspections (SGS, BV, TÜV)
🕒 Add 3–7 days for projects requiring full documentation and third-party inspection protocols.
4. Shipping & Site Delivery
With Pipekom’s experience delivering to over 17 countries in the Middle East and Africa:
Destination | Transit Time | Mode |
KSA, UAE, Oman | 8–14 days | Sea |
Egypt, Libya | 6–10 days | Sea |
Jordan, Iraq | 3–6 days | Land |
Nigeria, Ghana | 25–35 days | Sea |
All shipments include:
Custom packaging per pipe size
Protective end caps
Complete packing list, COO, Mill Test Certificates
🚀 How Pipekom Ensures Fast Pipe Delivery
At Pipekom, fast delivery is not a slogan — it's a process:
Synchronized Sourcing: With access to Tier-1 mills in Turkey, China, and Europe, we balance availability, compliance, and geography to minimize delays.
Integrated Coating Facilities: Coordinated project scheduling across in-house and partner coating lines with real-time QA/QC.
AI-Driven Planning: Intelligent procurement forecasting, allowing us to reserve production slots ahead of demand.
Dedicated Export Desk: Complete control of document flow, customs compliance, and port coordination.
📌 Project Snapshot – Water Transmission (UAE)
Scope: 6 km of DN600 steel pipes, 3LPE-coated (EN 10219 + ISO 21809)
Challenge: 30-day delivery window
Execution:
Manufacturing: 16 days
Coating: 6 days
Documentation & inspection: 3 days
Transport (Jebel Ali): 5 days
Total Lead Time: 30 days from PO to delivery
✅ Conclusion
Contractors managing high-value infrastructure projects cannot afford unpredictability in their pipe supply chain. A reliable pipe supplier must deliver more than steel — they must deliver speed, compliance, and documentation, all within strict timelines.
At Pipekom, we specialize in fast pipe delivery, underpinned by mill relationships, quality assurance systems, and logistics infrastructure that deliver results you can plan on.