Infrastructure Boom in Saudi Arabia: Pipe Demand Forecast to 2030 (with Market Data)
- Pipekom
- Jul 21
- 2 min read
Saudi Arabia is undergoing an unprecedented construction wave as part of Vision 2030, with infrastructure spending expected to exceed $1.1 trillion over the next decade.
This surge has created massive demand for pipeline systems — particularly for ductile iron (DI), welded steel, GRP, and HDPE — across water, oil & gas, and urban development sectors.
Saudi Infrastructure Spending Outlook (2024–2030)
Sector | Planned Spending (USD) | Pipe Usage Share (%) |
NEOM + The Line | $500+ billion | 15–20% |
Water & Wastewater Projects | $50+ billion | 60–70% |
District Cooling Systems | $12–15 billion | 40–50% |
Oil & Gas Pipelines (Aramco) | $100+ billion | 80–90% |
Housing & Urban Development | $200+ billion | 10–15% |
These projects are expected to drive annual demand of over 1.5 million metric tons of pipes by 2030, according to data from MEED and regional tender authorities.
📊 Pipe Demand Forecast by Type (2024–2030)
Pipe Type | 2024 Demand (tons) | 2030 Forecast (tons) | CAGR (est.) |
Ductile Iron (DI) | 310,000 | 560,000 | 9.8% |
Welded Steel | 420,000 | 710,000 | 9.2% |
GRP Pipes | 120,000 | 230,000 | 11.1% |
HDPE Pipes | 170,000 | 280,000 | 8.7% |
Demand is strongest in:
Water transmission lines (DI & GRP)
District cooling and oil networks (Steel)
Urban infrastructure (HDPE, DI)
⚠️ Procurement Challenges in KSA
Despite high demand, contractors face critical issues:
🚢 Import delays (6–12 weeks average from Asia)
❌ Non-compliant products from low-cost vendors
💸 Rising transport & customs costs (15–22% YoY)
This opens the door for regional suppliers with stock availability, shorter lead times, and tested quality.
🔧 Pipekom’s Value in Saudi Arabia
Pipekom actively supports Saudi contractors and engineering offices with:
Solution | Value Delivered |
✅ Certified Pipes | ISO 2531, EN 545, AWWA C200 |
🛠 DI & Steel Pipes | DN80–DN1200 ranges for water & oil use |
🔍 Inspection & Testing | Factory QC + third-party test reports |
🚛 Fast Delivery | Via Jeddah & Dammam ports (2–5 weeks) |
🗂 Documentation Support | SABER, SFDA, SASO files provided |
🔮 What to Expect by 2030
By the end of this decade:
🇸🇦 Over 7,000 km of new pipeline installations expected
📈 Pipe market to cross $4 billion annually in Saudi Arabia alone
🏗 Contractors will need fast, verified, and flexible suppliers
💬 Ready to Discuss Your Pipe Needs?
Whether you’re planning water infrastructure or managing a mega project, Pipekom is ready to support you with high-quality, project-based pipe supply.