Infrastructure Boom in Saudi Arabia: Pipe Demand Forecast to 2030 (with Market Data)

  • Writer: Pipekom
    Pipekom
  • Jul 21
  • 2 min read

Saudi Arabia is undergoing an unprecedented construction wave as part of Vision 2030, with infrastructure spending expected to exceed $1.1 trillion over the next decade.

This surge has created massive demand for pipeline systems — particularly for ductile iron (DI), welded steel, GRP, and HDPE — across water, oil & gas, and urban development sectors.


Saudi Infrastructure Spending Outlook (2024–2030)

Sector

Planned Spending (USD)

Pipe Usage Share (%)

NEOM + The Line

$500+ billion

15–20%

Water & Wastewater Projects

$50+ billion

60–70%

District Cooling Systems

$12–15 billion

40–50%

Oil & Gas Pipelines (Aramco)

$100+ billion

80–90%

Housing & Urban Development

$200+ billion

10–15%

These projects are expected to drive annual demand of over 1.5 million metric tons of pipes by 2030, according to data from MEED and regional tender authorities.


📊 Pipe Demand Forecast by Type (2024–2030)

Pipe Type

2024 Demand (tons)

2030 Forecast (tons)

CAGR (est.)

Ductile Iron (DI)

310,000

560,000

9.8%

Welded Steel

420,000

710,000

9.2%

GRP Pipes

120,000

230,000

11.1%

HDPE Pipes

170,000

280,000

8.7%

Demand is strongest in:

  • Water transmission lines (DI & GRP)

  • District cooling and oil networks (Steel)

  • Urban infrastructure (HDPE, DI)


⚠️ Procurement Challenges in KSA

Despite high demand, contractors face critical issues:

  • 🚢 Import delays (6–12 weeks average from Asia)

  • Non-compliant products from low-cost vendors

  • 💸 Rising transport & customs costs (15–22% YoY)

This opens the door for regional suppliers with stock availability, shorter lead times, and tested quality.


🔧 Pipekom’s Value in Saudi Arabia

Pipekom actively supports Saudi contractors and engineering offices with:

Solution

Value Delivered

✅ Certified Pipes

ISO 2531, EN 545, AWWA C200

🛠 DI & Steel Pipes

DN80–DN1200 ranges for water & oil use

🔍 Inspection & Testing

Factory QC + third-party test reports

🚛 Fast Delivery

Via Jeddah & Dammam ports (2–5 weeks)

🗂 Documentation Support

SABER, SFDA, SASO files provided

🔮 What to Expect by 2030

By the end of this decade:

  • 🇸🇦 Over 7,000 km of new pipeline installations expected

  • 📈 Pipe market to cross $4 billion annually in Saudi Arabia alone

  • 🏗 Contractors will need fast, verified, and flexible suppliers